Standard water detail drawings w 25 water meter box detail w 26 standard gang meter assembly w 27 gang meter addressing single story building w 28 gang meter addressing multi story building w 29 typical 4 8 domestic water meter bypass installation.
Water main hot tap detail.
The basic steps to perform a hot tap are.
In many cases increasing the size of a tap will improve upon the amounts of water pressure in your home.
A tap connection controls the volume and pressure of water from the city main to the house.
D 8 water main trench details d 9 water main trench insulation detail d 10 water main polyethylene wrap detail d 11 thrust restraint concrete thrust block details d 12 thrust restraint restrained joint pipe d 13 precast valve basin for pipes up to 16 inch diameter d 14 brick masonry valve basin d 16 typical 1 inch to 2 inch water service.
Perform the hot tap by cutting the coupon.
Pro tapping performs wet taps from 4 to 36 360 around the main.
For a hot tap there are three key components necessary to safely drill into a pipe.
W 21 temporary water main blow off assembly.
One stop shop permits and plan review p.
480 312 2356 inspections permit inspections p.
Exhibit 2 provides a general schematic of a hot tapping procedure.
Planning zoning requests general plan p.
1 poly water line tapped into 8 c900 water main.
This video demonstrates how a new valve can be connected to a live water main without having to shut the water off so as to avoid interrupting service to a.
Connect the fitting on the existing pipeline by welding steel bolting cast iron or bonding plastic and install the valve.
Most wet tap connections are into water and sewer mains and can be performed while your system remains live and under working pressure.
A water main tap is the valve used to connect a homeowner s water line to the city water main.
Line stops hot taps pipe freeze plugs by passing services.
Install the hot tap machine through the permanent valve.
The fitting the valve and the hot tap machine.
Hot tap means the water main is live or charged hot.
The fitting is attached to the pipe mostly by welding.
Established in 1980 ift has been involved in critical pipeline solutions around the globe from large diameter sewage bypasses to complicated water system conversions for san salvador ift has performed thousands of hot taps line stops live valve installations pipe freeze plug insert valve.
4 hot dipped galvanized 5.
Indian school road scottsdale az 85251.